Categories
DAI
Development of a Land Audit Dashboard using Power BI integrated with ODK and QGIS data sources
TERMS OF REFERENCE FOR NON-KEY EXPERT
Title of Assignment
Development of a Land Audit Dashboard using Power BI integrated with ODK and QGIS data sources
Budget Line/ Expert Category
-
1 Senior NKE
Relevant project activity #
-
Output 3.3: District Audit Methodology Carried out by Capacitated District Authorities
Audit Question
-
N/A
Location
-
Lusaka, Zambia
Duration
-
54 days
Expected start date
-
12/05/2025
Expected end date
-
12/09/2025
The EU support to the National Land Audit (NLA) project aims to improve land administration and management in Zambia. The project focuses on:
-
Improving the National Spatial Data Infrastructure (NSDI), updating it with information that is publicly available and accessible, and producing land cover, and land use maps at the National level
-
Making available and accessible key results of the National Land Audit
-
Testing and validating Innovative National Land Audit methodologies
-
Providing guidance for shaping a full National Land Audit implementation and forming a post audit action plan
I. Background of the Assignment
A key output is the development of a dynamic and interactive Land Audit Dashboard that will visualize key indicators linked to the nine (9) audit questions, using data collected from:
-
Field surveys (ODK)
-
Geospatial datasets (QGIS)
-
Administrative land information systems
This dashboard will support decision-making for:
-
Policymakers
-
Stakeholders
-
The public
II. General Objective of the Assignment
GENERAL OBJECTIVES
-
Develop an interactive, spatially enabled and user-friendly Land Audit Dashboard using Microsoft Power BI, integrating datasets from ODK and QGIS, to visualize and analyze indicators related to the 9 National Land Audit questions.
SPECIFIC OBJECTIVES
-
Conduct user requirement analysis to identify key needs and expectations for the Land Audit Dashboard among NLA, MLNR, and other stakeholders.
-
Design the structure and indicators of the National Land Audit Dashboard mapped to the nine audit questions.
-
Ensure the dashboard design meets user needs, including data visualization, filtering, and spatial display capacities.
-
Develop an automated and scalable data workflow from ODK to Power BI.
-
Develop an interactive dashboard design reflecting user requirements.
-
Produce visualizations (tables, charts, maps) that dynamically display the land audit results.
-
Align and process datasets from ODK, and spatial data layers from QGIS, for integration into Power BI.
-
Integrate data from ODK forms, QGIS spatial layers, and administrative datasets.
-
Map audit indicators to the 9 core audit questions, enabling drilldowns and thematic analysis.
-
Deploy the dashboard on the National Land Audit (NLA) server environment, ensuring secure and controlled access.
-
Conduct full testing, documentation, and validation of the dashboard.
-
Provide user and administrator training on dashboard usage and updates. Conduct training for NLA and district staff on dashboard usage, maintenance, and data interpretation.
-
Provide a comprehensive user manual and technical documentation.
EXPECTED RESULTS
-
Fully functional and interactive Land Audit Dashboard in Power BI aligned with the nine audit questions.
-
User needs and requirements clearly documented and reflected in the dashboard design.
-
Integrated and automated data pipeline combining ODK and QGIS datasets.
-
Dashboard deployed and operational on NLA’s secure server.
-
Comprehensive testing of dashboard functionalities and performance.
-
Trained NLA and district staff on dashboard use and maintenance.
-
Detailed user manual and technical guide for dashboard operation.
-
Recommendations for future enhancements and broader roll-out.
III. Scope of Work
Target Groups
-
Ministry of Lands and Natural Resources (MLNR)
-
Zambia Statistics Agency
-
Smart Zambia Institute
-
Ministry of Agriculture
-
Civil society and customary land rights organizations (limited access layer)
SPECIFIC ACTIVITIES
Sub-Activity | Location | Number of workdays |
---|---|---|
Briefing with the EUD and with the MLNR | Lusaka | 1 |
User needs assessment and requirements collection workshops | Lusaka | 4 |
Review of ODK datasets, QGIS spatial layers, and audit questions | Lusaka | 2 |
Data integration from ODK (surveys), QGIS (spatial), and administrative datasets | Lusaka | 2 |
Design of dashboard structure and indicator framework | Lusaka | 3 |
Dashboard design proposal | Lusaka | 1 |
Dashboard development in Power BI and integration with ODK and QGIS | Lusaka | 12 |
Linking spatial layers in QGIS with tabular data for interactive mapping | Lusaka | 4 |
Internal testing and validation of dashboard functionality | Lusaka | 3 |
Deployment on NLA server, configuring access roles | Lusaka | 2 |
Testing of dashboard functionalities with selected stakeholders | Lusaka | 2 |
Incorporation of feedback and final adjustments | Lusaka | 2 |
Documentation development (admin and user guides) | Lusaka | 4 |
Final testing of deployed dashboard | Lusaka | 2 |
User training (admin and end-user) | Lusaka | 5 |
Final presentation and live demonstration to stakeholders | Lusaka | 1 |
Debriefing with the EUD and with the MLNR | Lusaka | 1 |
NKE Reporting | Lusaka | 3 |
Support during user acceptance testing (UAT) and adjustments | Remote | 5 |
Total number of days: 54
IV. Deliverables and Reporting Requirements
FORMAL DELIVERABLES
The working language of the assignment will be English.
An electronic copy of each of the below-mentioned deliverables should be submitted first to the Team Leader and KE3 within the respective timeframe. The Team Leader will submit them to the Contracting Authority and MLNR.
Objective | Specific Deliverables | Deadline |
---|---|---|
1 | User needs assessment report and dashboard design proposal | Day 10 |
2 | Integrated dataset (ODK, QGIS, admin data) ready for Power BI model | Day 20 |
3 | Beta version of the Land Audit Dashboard with mapped audit indicators | Day 30 |
4 | Tested and validated dashboard | Day 40 |
5 | Final deployed dashboard on NLA server | Day 45 |
6 | Training sessions conducted | Day 47 |
7 | User and administrator manuals/documentation | Day 48 |
8 | Final presentation to stakeholders | Day 50 |
ADMINISTRATIVE OUTPUTS
-
Monthly Time Sheets including task description signed and submitted to Team Leader.
-
Monthly report describing activities, outputs, and indicators achieved.
V. Supervision and Backstopping
-
The Team Leader supervises overall.
-
KE3 supervises technical aspects.
-
Project Officer in Lusaka supports with logistics, meetings, and admin.
-
The expert must contact the Team Leader prior to start.
-
The Project Manager and Director (Contractor HQ) review all formal deliverables.
VI. Candidate Selection Criteria
Qualifications
-
Bachelor’s degree in IT, Data Science, GIS, Statistics, or related field
General Professional Experience
-
5+ years in Power BI dashboard development, data modeling
-
Knowledge of ODK and integration techniques Survey Data
-
Experience in QGIS and geospatial data handling
-
Familiarity with land administration/audit indicators desirable
Specific Skills
-
Proven ability to link spatial and statistical data, design interactive dashboards
-
Fluent in English (written and spoken)
-
Experience in delivering user/admin training
VII. Logistics and Timetable
-
Expert based in Lusaka; may travel to provinces/districts as needed
-
Assignment dates: Start – 12/05/2025 | End – 12/09/2025
Application Instructions:
Interested candidates are invited to submit their applications (cover letter and CV) to:
-
Ms. Daisy L. Mwila: Daisy_Mwila@dai.com
Deadline: 2nd May 2025
Only shortlisted candidates will be contacted.
4/23/2025
DAI
How to apply
To apply for this job email your details to Daisy_Mwila@dai.com